The following case study focuses on the successful installation of a TCO DTHP-R Barrier Plug utilised for a long-term well suspension campaign.
The following case study focuses on the latest successful application conducted in the NCS region where the E-trigger facilitated the seamless cycling open of a plug, redefining the possibilities in well production.
The FNR is the first API 19CI Qualified Retrievable Injection Valve to be installed in the North Sea. This case study outlines the challenges faced, the solution developed, and the resulting benefits of this ground-breaking technology.
TCO's recent breakthrough in subsea technology is the Disappearing Tubing Hanger Plug (DTHP) with fluid bypass sleeve. With remote opening and closing mechanisms and TR qualified control line clamps, this innovation has significant implications for safety and efficiency in subsea operations. This case study will explore its benefits.
Our client wanted to remove the displacement of Nitrogen process to increase safety and reduce time.